Monday, 22 October 2012

SEM 2 WEEK 11 and WEEK 12

TITLE:
Testing the circuit driver with the BLDC motor 

OBJECTIVE:
To determine the driver is functioning or not

DISCUSSION/ANALYSIS:
The driver was tested at UPM due to equipment and the suitable motor there. The arrangement for testing the circuit was arranged by my supervisor. Below is  the driver and motor connection.

l


 
CONCLUSION:
The driver was successful function. All the result recorded.

No comments:

Post a Comment